You don't have javascript enabled. Good luck with that.
Pencarian
 Beronjong Sepanjang 108 Meter Dipasang di Pulau Lancang

75 Gabions Installed on Lancang Island to Hold Waves

Thousand Island Water Resources (SDA) Sub-department installs gabion at RT 01 RW 01 of Lancang Island, Pari Island Urban Village, South Thousand Islands to hold the waves.

We deploy 17 PJLP personnel to install 75 gabions with length 108 meters

Thousand Island SDA Sub-department Head, Ahmad Saiful stated, gabion installation has been started since last month and targeted to finish three days ahead.

"We deploy 17 PJLP personnel to install 75 gabions with length 108 meters," he informed, Tuesday (5/14).

50 Absorption Wells in Thousand Islands Developed

He explained, those gabions are installed in the eastern side and southern side of Lancang Island to hold waves and prevent abrasion on breakwater cubes.

Linked News
Popular News indeks
  1. 21 Parking Spots to Make Your Jakarta 499th Anniversary Experience Seamless

    access_time26-06-2026 remove_red_eye914 personAldi Geri Lumban Tobing
  2. Over 11 Kilometers of Overhead Utility Cables Removed in West Jakarta

    access_time26-06-2026 remove_red_eye875 personBudhi Firmansyah Surapati
  3. Celebrating Jakarta`s 499th Anniversary at HI, Please Use Public Transportation

    access_time26-06-2026 remove_red_eye738 personAldi Geri Lumban Tobing
  4. 190 Satpol PP Personnel Deployed to Secure Jakarta Anniversary Celebration

    access_time26-06-2026 remove_red_eye704 personFolmer
  5. Night at The Library Marks Jakarta's 499th Anniversary with Five-Century Message

    access_time27-06-2026 remove_red_eye680 personAnita Karyati